FirstEnergy
Sector unknown·FE · USA (SEC 10-K)·Fiscal year to 31/12/2025
BUSINESS The Companies FE and its subsidiaries are principally involved in the transmission, distribution, and generation of electricity.
Exposure profile
Derived from what the company itself writes. Empty directions mean the report doesn't mention themes of that type.
In their own words
Grouped by theme, from the management review in the annual report. A · The company itself is a verbatim quote, B · From the report is without a verified quote.
Consumer spending
Macro
DriverPositive impact: strengthens
“Default Service Certain of the Electric Companies have default service obligations to provide power to non-shopping customers who have elected to continue to receive service under regulated retail tariffs. These default service plans vary by state and service territory, and volume of sales can vary depending on the level of shopping that occurs.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“PJM’s recent capacity auctions have been subject to a “price collar” that has resulted from all-time high generation capacity prices in recent auction outcomes. These all-time high capacity prices ultimately are passed through in retail rates and can result in material increases in retail customers’ monthly electric utility bills.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“On January 16, 2026, the PJM board along with various federal and state officials, expressed interest in extending the price collar through mid-2030. In addition, the parties to the Statement of Principles suggested that PJM should conduct a “backstop” auction to procure additional generation capacity, with the costs to be allocated first to “new” data centers and second to existing PJM loads. If the PJM capacity auctions continue to clear at the auction cap, and if PJM conducts a “backstop” capacity auction that clears at a high price point, customer resistance to the resulting market driven increases on the generation portion of their bills could lead to increased pressure for state and federal utility regulators to limit the needed capital investment in transmission and distribution systems required for safe, reliable and resilient service to customers, which may impair our ability to earn a fair and equitable return on our investments and execute our strategy.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Our investments in transmission and distribution infrastructure modernization, reliability improvements, environmental compliance and storm hardening may increase customer bills over time and the resulting higher electric bills, when combined with the external pressures discussed above, may place pressure on residential customers’ affordability, particularly in portions of our service territory with lower median household income or high energy burdens and/or amongst those customers who have already seen significant retail bill increases. State and federal regulators may also adopt or modify policies intended to mitigate customer bill impacts – including disallowance or delayed recovery of certain capital investments or operating expenses, mandated bill assistance programs, changes to rate design, or restrictions on rate increases.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Customer concerns regarding affordability may result in increased regulatory scrutiny, constraints on the size and timing of rate increases, expanded bill 12 mitigation requirements, or disallowances, any of which could adversely affect our ability to recover costs or earn our authorized return on equity. In addition, sustained increases in customer bills may lead to reduced electricity usage through conservation, energy efficiency, or distributed generation, which could limit future load growth and revenues.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“We could also be adversely impacted if any future increases to energy prices result in a decrease in customer usage.”
Annual report 2025A · The company itself
DriverMixed impact: mixed
“To the extent weather conditions are affected by climate change, customers’ energy use could increase or decrease depending on the duration and magnitude of the changes. Increased energy use due to weather changes may require us to invest in additional system assets and purchase additional power.”
Annual report 2025A · The company itself
Market
“FirstEnergy's Distribution segment, which consists of the Ohio Companies and FE PA, distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its default service or standard service offer requirements.”
Annual report 2025A · The company itself
Market
“JCP&L’s Distribution segment distributes electricity to approximately 1.2 million customers in New Jersey across its distribution footprint and procures electric supply to serve its BGS customers through a statewide auction process approved by the NJBPU.”
Annual report 2025A · The company itself
Chains in: Inflation weakens
Chains out: this strengthens Retail, strengthens Hospitality and leisure, strengthens Premium consumers, strengthens Grocery retail and private label
Energy efficiency
Technology
DriverPositive impact: strengthens
“The EmPOWER Maryland program, following passage of the Climate Solutions Now Act of 2022, required annual incremental energy efficiency targets of 2% per year from 2022 through 2024, 2.25% per year in 2025 and 2026, and 2.5% per year in 2027 and thereafter. On August 1, 2023, PE filed its proposed plan for the 2024-2026 cycle as required by the MDPSC.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“On December 29, 2023, the MDPSC issued an order approving the $311 million scenario for most programs, with some modifications. On August 15, 2024, PE filed a revised plan for the remainder of the 2024-2026 cycle to comply with refined GHG reduction targets with a total budget of $314 million, which the MDPSC approved on December 27, 2024.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Consistent with an MDPSC order dated December 29, 2022, phasing out the unamortized balances of EmPOWER Maryland investments, PE is required to expense 67% of its EmPOWER Maryland program costs in 2025, and 100% in 2026 and beyond. All previously unamortized costs for prior cycles are to be collected by the end of 2030, consistent with the 2024-2026 order issued on December 29, 2023.”
Annual report 2025A · The company itself
StrategyPositive impact: strengthens
“Additionally, the Ohio Companies requested recovery of certain incurred costs, including the impact of major storms, a program to convert streetlights to LEDs, and others.”
Annual report 2025A · The company itself
StrategyPositive impact: strengthens
“Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, the Pennsylvania Companies implemented energy efficiency and peak demand reduction programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for WP; and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWh for ME, 3.0% MWh for PN, 2.7% MWh for Penn, and 2.4% MWh for WP. The fourth phase of FE PA’s energy efficiency and peak demand reduction program, which runs for the five-year period beginning June 1, 2021 through May 31, 2026, was approved by the PPUC on June 18, 2020, providing cost 149 recovery of approximately $390 million to be recovered through Energy Efficiency and Conservation Phase IV Riders for each FE PA rate district.”
Annual report 2025A · The company itself
StrategyPositive impact: strengthens
“On November 26, 2025, FE PA submitted a petition for approval of its Phase V Energy Efficiency and Conservation Plan, which includes energy efficiency and peak demand reduction programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.01% MW, and energy consumption reduction targets, as a percentage of FE PA’s historic 2009 to 2010 reference load, at 2.00% MWh. The proposed plan includes cost recovery of approximately $390 million to be recovered through its Phase V Energy Efficiency and Conservation Charge Rider and runs for a five-year period beginning June 1, 2026, through May 31, 2031.”
Annual report 2025A · The company itself
Chains in: Carbon tax and ETS prices strengthens, EU climate and energy policy strengthens
Utilities
End markets
DriverNegative impact: weakens
“In February 2025, the NJBPU certified the results of its annual basic generation service auctions through which New Jersey’s four EDCs – including JCP&L – satisfy their generation supply requirements for BGS customers for the period beginning June 1, 2025 through May 31, 2026. The certified results resulted in significant rate increases for New Jersey EDC customers and, by 145 order dated April 23, 2025, the NJBPU directed the four EDCs to submit proposals to mitigate the impact of the rate increases that affected residential customers beginning June 1, 2025.”
Annual report 2025A · The company itself
DriverPositive impact: strengthens
“OHIO Until the rates approved in the 2024 base rate case go into effect, the Ohio Companies will continue to operate under PUCO-approved base distribution rates that became effective in 2009. The Ohio Companies operated under ESP IV through May 31, 2024, which provided for the supply of power to non-shopping customers at a market-based price set through an auction process.”
Annual report 2025A · The company itself
Market
“The Electric Companies distribute electricity through FirstEnergy’s utility operating companies and also control 3,610 MWs of regulated electric generation capacity located primarily in West Virginia and Virginia. Each of the Electric Companies earns revenue from state-regulated rate tariffs under which it provides distribution services to residential, commercial and industrial customers in its service territory.”
Annual report 2025A · The company itself
Market
“NEW JERSEY JCP&L operates under NJBPU approved rates that took effect as of February 15, 2024, and became effective for customers as of June 1, 2024. JCP&L provides BGS for retail customers who do not choose a third-party EGS and for customers of third-party EGSs that fail to provide the contracted service.”
Annual report 2025A · The company itself
Market
“With respect to their wholesale services and rates, the Electric Companies, AE Supply and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE and the Transmission Companies to provide open access transmission service at FERC-approved rates, terms and conditions.”
Annual report 2025A · The company itself
Artificial intelligence
Technology
DriverNegative impact: weakens
“Increasingly sophisticated cyber-attacks, ransomware, and other security breaches—whether targeting us or third parties with whom we do business—could disrupt operations, compromise confidential information, and result in significant financial, legal, and reputational harm. Cybersecurity threats, including those that exploit advances in technologies such as artificial intelligence, continue to grow in frequency and sophistication, and the security controls we implement may not fully prevent or detect all such threats or incidents. Emerging artificial intelligence technologies may be used to develop new hacking tools, obscure malicious activities, exploit vulnerabilities, and increase the difficulty of detecting threats. Despite ongoing investments in cybersecurity, we cannot guarantee prevention or timely detection of all threats, which continue to evolve and may be amplified by interconnected systems.”
Annual report 2025A · The company itself
Market
“Secretary of Energy directed FERC to conduct a rulemaking procedure to develop regulations that would speed interconnection to the transmission system of large loads, including “Artificial Intelligence” data centers and “hybrid” data center/electric generation facilities.”
Annual report 2025A · The company itself
Chains out: this strengthens Data centres, strengthens Semiconductors and electronic components, strengthens Semiconductor industry
Wind power
Technology
DriverNegative impact: weakens
“On October 31, 2023, offshore wind developer, Orsted, announced plans to cease development of two offshore wind projects in New Jersey—Ocean Wind 1 and 2—having a combined planned capacity of 2,248 MWs. On January 30, 2025, and February 25, 2025, Shell New Energies US LLC and EDF Renewables North America respectively announced that each was exiting its Atlantic Shores partnership to construct wind energy off the shore of New Jersey.”
Annual report 2025A · The company itself
StrategyPositive impact: strengthens
“On September 17, 2021, in connection with Mid-Atlantic Offshore Development, LLC, a transmission company jointly owned by Shell New Energies US LLC and EDF Renewables North America, JCP&L submitted a proposal to the NJBPU and PJM to build transmission infrastructure connecting offshore wind-generated electricity to the New Jersey power grid. On October 26, 2022, the JCP&L proposal was accepted, in part, in an order issued by NJBPU.”
Annual report 2025A · The company itself
Chains in: Interest rates weakens, Energy security strengthens
Chains out: this strengthens Steel, strengthens Rare earths and critical raw materials, strengthens Renewables auctions and subsidies, strengthens Power grid expansion
Natural gas
Raw materials and inputs
DriverPositive impact: strengthens
“Additionally, on October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC proposing, among other things, the addition of 70 MWs of solar generation by 2028, and 1,200 MWs of natural gas combined cycle generation by 2031, which are expected to require an estimated capital investment of approximately $2.5 billion, as detailed in the filing.”
Annual report 2025A · The company itself
DriverPositive impact: strengthens
“To ensure that MP and PE can meet their PJM adequacy requirements, the plan proposes, among other things, near-term market capacity purchases, and the addition of 70 MWs of solar generation by 2028 and 1,200 MWs of natural gas combined cycle generation by 2031.”
Annual report 2025A · The company itself
InputNegative impact: weakens
“The proposed increase is driven primarily by an under-recovery balance as of June 30, 2025, and higher costs for fuel and reagents.”
Annual report 2025A · The company itself
StrategyPositive impact: strengthens
“On October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC, which contemplated the addition of 70 MWs of solar generation by 2028, and 1,200 MWs of natural gas combined cycle generation by 2031 and on February 13, 2026, MP and PE filed a request for a CPCN with the WVPSC to construct and operate the same.”
Annual report 2025A · The company itself
Market
“The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and operates 3,610 MWs of regulated generation capacity located primarily in West Virginia and Virginia, which includes three solar generation sites, representing 30 MWs of generation capacity.”
Annual report 2025A · The company itself
Market
“On February 13, 2026, MP and PE filed a CPCN to construct and operate a 1,200 MW combined cycle gas turbine plant and 70 MWs of solar generation capacity for an estimated capital investment totaling approximately $2.7 billion as of the date of the filing.”
Annual report 2025A · The company itself
Market
“WEST VIRGINIA MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates that became effective March 27, 2024. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC.”
Annual report 2025A · The company itself
United States
Geography
StrategyPositive impact: strengthens
“On February 26, 2025, in response to the PJM 2024 RTEP Long-Term Proposal Window #1, PJM awarded two electric transmission projects to Valley Link estimated to be approximately $3 billion, with FET’s share estimated to be approximately $1 billion.”
Annual report 2025A · The company itself
StrategyPositive impact: strengthens
“On February 12, 2026, in response to the PJM 2025 RTEP Long-Term Proposal Window #1, PJM awarded a project to Grid Growth estimated to be approximately $1 billion, with FET’s share estimated to be approximately $448 million.”
Annual report 2025A · The company itself
Geography
“Regulated Electric Company Operating Subsidiaries The Electric Companies’ combined service areas encompass approximately 65,000 square miles in Ohio, Pennsylvania, West Virginia, Maryland, New Jersey, and New York, providing distribution services for over six million customers in an area with a population of approximately 14 million and a total rate base of approximately $21.3 billion as of December 31, 2025.”
Annual report 2025A · The company itself
Geography
“FirstEnergy's Distribution segment, which consists of the Ohio Companies and FE PA, representing $11.1 billion in rate base as of December 31, 2025, distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its default service or standard service offer requirements.”
Annual report 2025A · The company itself
Geography
“FirstEnergy's Integrated segment includes the distribution and transmission operations of JCP&L, MP and PE, as well as MP’s regulated generation operations, representing $10.2 billion in rate base as of December 31, 2025. The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and operates 3,610 MWs of regulated generation capacity located primarily in West Virginia and Virginia, which includes three solar generation sites, representing 30 MWs of generation capacity.”
Annual report 2025A · The company itself
Geography
“JCP&L’s Distribution segment distributes electricity to approximately 1.2 million customers in New Jersey across its distribution footprint and procures electric supply to serve its BGS customers through a statewide auction process approved by the NJBPU.”
Annual report 2025A · The company itself
Chains in: USD vs DKK/EUR mixed effect
Data centres
Technology
DriverPositive impact: strengthens
“Supply Plan Supply Chain While supply lead times have not fully returned to levels prior to the COVID-19 pandemic, FirstEnergy continues to monitor the situation in light of demand increases across the industry, including due to data center usage, and the imposition of tariffs and retaliatory tariffs that have been, and may be, imposed by the U.S. government in response.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Secretary of Energy, is also considering whether to develop regulations intended to speed interconnection of AI data centers and “hybrid” data center/electric generation facilities (collectively, “large loads”) to the transmission system. Final regulations, if any, from FERC are expected in the second quarter of 2026. To the extent the new regulations promulgated by FERC do not permit transmission utilities to fully recover costs associated with transmission network upgrades required to serve new large loads, our strategy of investing in transmission could be adversely affected.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“On January 16, 2026, the PJM board along with various federal and state officials, expressed interest in extending the price collar through mid-2030. In addition, the parties to the Statement of Principles suggested that PJM should conduct a “backstop” auction to procure additional generation capacity, with the costs to be allocated first to “new” data centers and second to existing PJM loads. If the PJM capacity auctions continue to clear at the auction cap, and if PJM conducts a “backstop” capacity auction that clears at a high price point, customer resistance to the resulting market driven increases on the generation portion of their bills could lead to increased pressure for state and federal utility regulators to limit the needed capital investment in transmission and distribution systems required for safe, reliable and resilient service to customers, which may impair our ability to earn a fair and equitable return on our investments and execute our strategy.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“At the same time, our planning could be adversely affected if electricity usage by data centers is ultimately lower than projected, which could reduce anticipated load growth.”
Annual report 2025A · The company itself
Market
“Secretary of Energy directed FERC to conduct a rulemaking procedure to develop regulations that would speed interconnection to the transmission system of large loads, including “Artificial Intelligence” data centers and “hybrid” data center/electric generation facilities.”
Annual report 2025A · The company itself
Chains in: Artificial intelligence strengthens
Chains out: this strengthens Electricity, strengthens Copper
Solar power
Technology
DriverPositive impact: strengthens
“Additionally, on October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC proposing, among other things, the addition of 70 MWs of solar generation by 2028, and 1,200 MWs of natural gas combined cycle generation by 2031, which are expected to require an estimated capital investment of approximately $2.5 billion, as detailed in the filing.”
Annual report 2025A · The company itself
DriverPositive impact: strengthens
“To ensure that MP and PE can meet their PJM adequacy requirements, the plan proposes, among other things, near-term market capacity purchases, and the addition of 70 MWs of solar generation by 2028 and 1,200 MWs of natural gas combined cycle generation by 2031.”
Annual report 2025A · The company itself
Market
“The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and operates 3,610 MWs of regulated generation capacity located primarily in West Virginia and Virginia, which includes three solar generation sites, representing 30 MWs of generation capacity.”
Annual report 2025A · The company itself
Market
“MP owns or contractually controls 3,610 MWs of generation capacity that is supplied to its electric utility business, including 30 MWs of Solar generation and 487 MWs of pumped-storage hydroelectric generation from its 16.25% undivided interest in the Bath County facility in Virginia through its wholly owned subsidiary AGC.”
Annual report 2025A · The company itself
Coal and coke
Raw materials and inputs
DriverNegative impact: weakens
“During 2024, as a result of the evaluation of closure options for McElroy’s Run CCR impoundment facility and the adjacent landfill, AE Supply reviewed its ARO and future expected costs to remediate, resulting in an increase to the ARO liability of $87 million. AE Supply transferred the McElroy’s Run CCR impoundment facility and adjacent dry landfill and related remediation obligations on March 4, 2025, pursuant to the environmental liability transfer agreement dated February 3, 2025 with a subsidiary of IDA Power, LLC.”
Annual report 2025A · The company itself
InputNegative impact: weakens
“On March 29, 2023, the EPA published proposed revised ELGs applicable to coal-fired electric generation facilities that include more stringent effluent limitations for wet scrubber systems and ash transport water, and new limits on landfill leachate. The rule was issued as final by the EPA on April 25, 2024.”
Annual report 2025A · The company itself
Market
“MP has coal-fired generation capacity, which exposes it to risk from regulations relating to coal, GHGs and CCRs, which could lead to increased costs or the need to spend significant resources to defend allegations of violation. (Applies to FE) MP owns and maintains coal-fired electric generation facilities located in West Virginia. Historically, coal-fired generation has greater exposure to the costs of complying with federal, state and local environmental statutes, rules and regulations relating to air emissions, including GHGs and CCR disposal, than other types of electric generation facilities.”
Annual report 2025A · The company itself
Electricity
Raw materials and inputs
Market
“BUSINESS The Companies FE and its subsidiaries are principally involved in the transmission, distribution, and generation of electricity.”
Annual report 2025A · The company itself
Market
“FirstEnergy's Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $5.4 billion in FirstEnergy-owned rate base as of December 31, 2025, includes transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs.”
Annual report 2025A · The company itself
Market
“FirstEnergy’s electric operating companies comprise one of the nation’s largest investor-owned electric systems, serving over six million customers in the Midwest and Mid-Atlantic regions.”
Annual report 2025A · The company itself
Chains in: Data centres strengthens, Electrification strengthens
Chains out: this strengthens Power grid expansion
Construction
End markets
StrategyPositive impact: strengthens
“On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ with the NJBPU that would, among other things, support grid modernization, system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. JCP&L proposes EnergizeNJ will be implemented over a five-year budget period with estimated costs of approximately $935 million over the deployment period, of which, $906 million is capital investments and $29 million is operating and maintenance expenses.”
Annual report 2025A · The company itself
StrategyPositive impact: strengthens
“On January 31, 2025, the Ohio Companies filed an application with the PUCO for ESP VI, for a term beginning on the date new base distribution rates from the pending base rate case go into effect, in an effort to align with the ongoing base distribution rate case, and continuing through May 31, 2028. ESP VI proposed to continue providing power to non-shopping customers at market-based prices set through an auction process, and proposed to continue riders supporting investment in the Ohio Companies’ distribution system, including Rider DCR with annual reliability performance-based revenue cap increases of $37 million to $43 million, and an AMI rider for recovery of approved grid modernization investments.”
Annual report 2025A · The company itself
Chains in: Interest rates weakens, Housing market strengthens, Public investment and infrastructure strengthens, Business cycle and GDP growth strengthens, Reconstruction of Ukraine strengthens
Real estate
End markets
Market
“PROPERTIES The first mortgage indentures for the Ohio Companies, FE PA, MP and PE constitute direct first liens on substantially all of the respective physical property, subject only to excepted encumbrances, as defined in the first mortgage indentures.”
Annual report 2025A · The company itself
Chains in: Interest rates weakens
Retail
End markets
Market
“FirstEnergy's Distribution segment, which consists of the Ohio Companies and FE PA, distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its default service or standard service offer requirements.”
Annual report 2025A · The company itself
Chains in: Consumer spending strengthens
Financial regulation
Regulation
DriverNegative impact: weakens
“Our ability to capitalize on investment opportunities available to our distribution business depends, in part, on any future distribution rate cases or other filings seeking cost recovery for distribution system enhancements in the states where our Electric Companies operate, including maintaining the affordability of the rates charged to customers. Any denial of, or delay in, the approval of any future distribution or transmission rate requests could restrict us from fully recovering our cost of service, may impose risks on the distribution and transmission operations, and could have a material adverse effect on our regulatory strategy, results of operations and financial condition.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“The retail rates for each of the Electric Companies are set by each of its respective regulatory agency for utilities in the state in which it operates - in Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the 11 PPUC, in West Virginia by the WVPSC and in New York by the NYPSC – through traditional, cost-based regulated utility ratemaking. As a result, any of the Electric Companies may not be permitted to recover its costs and, even if it is able to do so, there may be a significant delay between the time it incurs such costs and the time it is allowed to recover them.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“FirstEnergy can provide no assurance that any base rate request filed by any of the Electric Companies will be granted in whole or in part. Any denial of, or delay in, any base rate request could restrict the applicable utility from fully recovering its costs of service, may impose risks on its operations, and may negatively impact such Electric Company’s results of operations, cash flows and financial condition.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“FERC policy currently permits recovery of prudently incurred costs associated with cost-of-service-based wholesale power rates and the expansion and updating of transmission infrastructure within its jurisdiction. FERC’s policies on recovery of transmission costs continue to evolve, evidenced by ongoing proceedings to determine an appropriate ROE methodology to determine transmission ROEs, to determine whether FERC’s existing policies on transmission rate incentives should be revised, and to determine whether certain classes of network transmission upgrade costs can be recovered in transmission rates and whether such costs will be direct charged to the connecting customer. If FERC were to adopt a different policy regarding recovery of transmission costs or if there is any resulting delay in cost recovery, our strategy of investing in transmission could be adversely affected.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Secretary of Energy, is also considering whether to develop regulations intended to speed interconnection of AI data centers and “hybrid” data center/electric generation facilities (collectively, “large loads”) to the transmission system. Final regulations, if any, from FERC are expected in the second quarter of 2026. To the extent the new regulations promulgated by FERC do not permit transmission utilities to fully recover costs associated with transmission network upgrades required to serve new large loads, our strategy of investing in transmission could be adversely affected.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Our investments in transmission and distribution infrastructure modernization, reliability improvements, environmental compliance and storm hardening may increase customer bills over time and the resulting higher electric bills, when combined with the external pressures discussed above, may place pressure on residential customers’ affordability, particularly in portions of our service territory with lower median household income or high energy burdens and/or amongst those customers who have already seen significant retail bill increases. State and federal regulators may also adopt or modify policies intended to mitigate customer bill impacts – including disallowance or delayed recovery of certain capital investments or operating expenses, mandated bill assistance programs, changes to rate design, or restrictions on rate increases.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Regulatory agencies may also require utilities to offset portions of rising costs related to grid modernization, resilience investments, environmental compliance, or rapidly evolving market conditions if they determine that such costs would unduly affect customer affordability. Any such actions could limit or delay our ability to recover costs or investments, earn a fair and equitable return, or maintain expected cash flows and could have an adverse effect on our businesses, financial condition, results of operations and cash flows.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“If we were found not to be in compliance with one or more of the mandatory reliability standards, we and/or our subsidiaries could be subject to sanctions, including substantial monetary penalties. For example, FERC has the authority under the FPA to impose penalties up to and including $1.5 million per day, subject thereafter to annual adjustments for inflation, for failure to comply with these mandatory reliability standards.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“In addition, PJM may direct our transmission-owning affiliates to build new transmission facilities to meet PJM's reliability requirements or to provide new or expanded transmission service under the PJM Tariff. We may be allocated a portion of the cost of transmission facilities built by others due to changes in RTO transmission rate design. We may be required to expand our transmission system according to decisions made by an RTO rather than our own internal planning processes.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“While FirstEnergy continues to believe, more likely than not, it will be subject to corporate AMT, additional IRS guidance or revised U.S. Treasury regulations, which are expected to be issued in the future, as well as potential tax legislation or presidential executive orders could provide certain adjustments to regulated utilities in calculating corporate AMT, which may reduce or otherwise significantly change FirstEnergy’s AMT estimates or its conclusions as to whether it is an AMT payer.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“On August 13, 2025, the NJBPU issued an Order to Show Cause reviewing JCP&L’s 2024 Annual System Performance Report, which includes information regarding JCP&L’s systems level of electric service reliability performance during the prior calendar year. Failure to attain NJBPU’s minimum reliability levels may subject JCP&L to a penalty.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“JCP&L requested that the NJBPU provide guidance either affirming the current project schedule or, alternatively, authorizing JCP&L to modify the schedule. On June 9, 2025, responses to JCP&L’s motion were filed with the NJBPU, including a cross-motion by the New Jersey Division of Rate Counsel to reopen the offshore wind transmission proceeding, which JCP&L opposed.”
Annual report 2025A · The company itself
Interest rates
Macro
DriverNegative impact: weakens
“State Regulation and Federal Regulation The following table summarizes the allowed ROE and the aggregate actual ROE of the Electric Companies and Transmission Companies as determined for regulatory purposes as of and for the year ended December 31, 2025: Actual ROE Segment Entity/State Allowed ROE FirstEnergy Stand-Alone Transmission FET 9.88%(1) - 12.7% 9.8% KATCo 10.45% Integrated Maryland 9.5% - Distribution 10.45% - Transmission New Jersey 9.6% - Distribution 10.2% - Transmission West Virginia 9.8% Distribution Ohio 10.5%(2) Pennsylvania Settled(3) (1) Reflects a 0.5% reduction to the 10.38% approved ROE due to the January 2025 Sixth Circuit ruling eliminating the 50 basis point adder associated with RTO membership (see "Outlook - FERC Regulatory Matters - Transmission ROE Incentive" in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional information and discussion.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“The success of our growth strategy will depend, in part, on the successful growth of revenue resulting from our transmission investments in line with our expectations. Factors that may affect our revenue growth may include: (1) FERC’s timely approval of rates to recover such investments; (2) whether investments are included in PJM's RTEP; (3) FERC's evolving policies with respect to incentive rates for transmission investment assets, the calculation of the base ROE component of transmission rates, and the interconnection of AI data centers and transmission network upgrades supporting such large loads; (4) FERC’s potentially-evolving policies regarding whether certain classes of network transmission upgrade costs can be capitalized as part of transmission rates and whether such costs will be direct charged to the connecting customer; (5) consideration and potential impact of the objections of those who oppose such investments and their recovery; and (6) timely development, construction, and operation of the new facilities.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“If FERC were to lower the rate of return it has authorized for FirstEnergy's cost-based wholesale power rates or transmission investments and facilities, it could reduce future earnings and cash flows, and adversely impact our financial condition.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Macroeconomic conditions that are beyond our control, such as government fiscal policy, tariffs, recessions, inflation and interest rate pressures, may negatively impact our financial condition, results of operations, liquidity, and cash flows. Economic conditions, including those that may arise from government fiscal policy, tariffs, recessions, inflationary and interest rate pressures, may impact the demand for electricity and, therefore, any decline in economic conditions could lead to declines in the demand for electricity, which would reduce our revenues.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Any future downgrades in FirstEnergy or its subsidiaries' credit ratings from the nationally recognized credit rating agencies, particularly to levels below investment grade, could negatively affect our ability to access the bank and capital markets, especially in a time of uncertainty in either of those markets, and may require us to post cash collateral to support outstanding commodity positions in the wholesale market, as well as available letters of credit and other guarantees. Furthermore, additional downgrades could increase the cost of such capital by causing us to incur higher interest rates and fees associated with such capital.”
Annual report 2025A · The company itself
DriverMixed impact: mixed
“The following table summarizes the key terms of state base rate orders in effect for the Electric Companies as of December 31, 2025: Company Rates Effective For Customers Allowed Debt/Equity Capital Structure Allowed ROE CEI (1) May 2009 51%/ 49% 10.5% FE PA January 2025 Settled(2) Settled(2) MP March 2024 Settled(2) 9.8% JCP&L June 2024 9.6% OE (1) January 2009 51% /49% 10.5% PE (West Virginia) March 2024 Settled(2) 9.8% PE (Maryland) October 2023 47% / 53% 9.5% TE (1) January 2009 51% / 49% 10.5% (1) On November 19, 2025, the PUCO issued an order in the Ohio Companies’ base rate case that authorized a capital structure of 48.8% debt and 51.2% equity, and an ROE of 9.63%.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“The Ohio Companies requested a net increase in base distribution revenues of approximately $94 million with a return on equity of 10.8% and capital structures of 44% debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, which reflects a roll-in of current riders such as DCR and AMI.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“On November 19, 2025, the PUCO issued an order in the rate case lifting the rate freeze and approving a net increase in base distribution revenues of the Ohio Companies of approximately $34 million, with a return on equity of 9.63% and a hypothetical capital structure of 48.8% debt and 51.2% equity for all three Ohio Companies, which reflects a roll-in of current riders such as DCR and AMI.”
Annual report 2025A · The company itself
Chains in: Public debt and fiscal policy strengthens, Inflation strengthens
Chains out: this weakens Construction, weakens Real estate, weakens Wind power, weakens Housing market, weakens Office and commercial property, weakens Residential rental, weakens Residential construction
Inflation
Macro
DriverNegative impact: weakens
“However, the situation remains fluid, and a prolonged continuation or further increase in demand, or the continuation of uncertain or adverse macroeconomic conditions, including inflationary pressures and new or increased existing tariffs, could lead to an increase in supply chain disruptions that could, in turn, have an adverse effect on the Registrants’ results of operations, cash flow and financial condition.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Macroeconomic conditions that are beyond our control, such as government fiscal policy, tariffs, recessions, inflation and interest rate pressures, may negatively impact our financial condition, results of operations, liquidity, and cash flows. Economic conditions, including those that may arise from government fiscal policy, tariffs, recessions, inflationary and interest rate pressures, may impact the demand for electricity and, therefore, any decline in economic conditions could lead to declines in the demand for electricity, which would reduce our revenues.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“We may be exposed to the risk of substantial price increases in, or the adequacy or availability of, the costs of labor and materials used in construction, nonperformance of equipment and increased costs due to inflation, interest rates or other macroeconomic forces, delays, including delays relating to the procurement of permits or approvals, adverse weather or environmental matters. We engage numerous contractors and enter into a large number of construction agreements to acquire the necessary materials and/or obtain the required construction-related services. As a result, we are also exposed to the risk that these contractors and other counterparties could breach their obligations to us. Such risk could include our contractors’ inabilities to procure sufficient skilled labor as well as potential work stoppages by that labor force.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“We could also be adversely impacted if any future increases to energy prices result in a decrease in customer usage.”
Annual report 2025A · The company itself
InputNegative impact: weakens
“Prices for equipment, materials, supplies, employee labor contractor services, together with the cost of variable-rate debt, have increased in recent years and could continue to increase in 2026 and beyond. Inflation and broader economic conditions have continued to drive up the price of the cost of essential components used in the construction of transmission infrastructure, such as electrical equipment, steel and aluminum, and we may experience supply chain disruptions and long lead times for critical equipment.”
Annual report 2025A · The company itself
InputNegative impact: weakens
“Inflation increases costs for labor, materials and services, and we may be unable to secure these resources on economically acceptable terms or offset such costs with increased revenues, operating efficiencies, or cost savings, which may adversely impact our financial condition, results of operations, liquidity, and cash flows.”
Annual report 2025A · The company itself
InputNegative impact: weakens
“However, we expect to continue to face increased cost pressures related to operation and maintenance expenses, including in the areas of health care and pension costs. We have experienced health care cost inflation in recent years, and we expect our cash outlay for health care costs, including prescription drug coverage, to continue to increase despite measures that we have taken requiring employees and retirees to bear a higher portion of the costs of their health care benefits. The measurement of our expected future health care and pension obligations and costs is highly dependent on a variety of assumptions, many of which relate to factors beyond our control.”
Annual report 2025A · The company itself
Chains out: this weakens Consumer spending, strengthens Interest rates
Climate change and extreme weather
Macro
DriverMixed impact: mixed
“Seasonality The sale of electric power is generally a seasonal business, and weather patterns can have, and have in the past had, a material impact on FirstEnergy’s Electric Companies' operating results, including JCP&L. Demand for electricity in their service territories historically peaks during the summer and winter months.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“In addition, severe weather, such as tornadoes, hurricanes, ice or snowstorms, droughts, high winds or other natural disasters, may cause outages and property damage that may require us to incur additional costs that are generally not insured and that may not be recoverable from customers. The effect of the failure of our facilities to operate as planned under these conditions would be particularly burdensome during a peak demand period and could have an adverse effect on our financial condition and results of operations, which adverse effects could be further exacerbated by an increased frequency of such severe weather events.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Operation of transmission and distribution facilities, and in the case of MP, electric generation facilities, involves risk, including the risk of potential breakdown or failure of equipment or processes due to aging infrastructure, fuel supply or transportation disruptions, accidents, labor disputes or work stoppages by employees, human error in operations or maintenance, acts of terrorism or sabotage, cyber-attacks, construction delays or cost overruns, shortages of or delays in obtaining equipment, material and labor, operational restrictions resulting from environmental requirements and governmental interventions, and operational performance below expected levels. In addition, weather-related incidents and other natural disasters can disrupt generation, transmission and distribution delivery systems.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Our results of operations could be adversely affected by events beyond our control, such as natural disasters, public health crises, government shutdowns, trade wars, recessions, political crises, negative global climate patterns, mine subsidence, or other catastrophic events. Our operations, or those of our vendors or suppliers, could be negatively impacted by various events beyond our control, including, but not limited to: natural disasters, such as hurricanes, tornadoes, floods, earthquakes, wildfires, extreme cold weather events and other adverse weather conditions; public health crises, such as pandemics and epidemics; prolonged government or regulator furloughs or shutdowns; trade wars; recessions; political crises, such as terrorist attacks, war, labor unrest, and other political instability; negative global climate patterns, especially in water stressed regions; surface subsidence from underground mining impacting our facilities; or other catastrophic events, such as fires or other disasters occurring at our distribution facilities or our service providers’ facilities, whether occurring in the United States or internationally.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“The physical risks associated with climate change may have an adverse impact on our business operations, financial condition and cash flows. Physical risks of climate change, such as flooding, wildfires, rising sea levels, and other related phenomena, resulting from more frequent or more extreme weather events and changes in temperature and precipitation patterns associated with climate change, could affect some, or all, of our operations. Frequent or extreme weather events could disrupt our operations and/or be destructive, which could result in increased costs, including supply chain costs.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“An extreme weather event within the Electric Companies' and Transmission Companies’ service areas could also directly affect their capital assets, such as downed wires, poles, or damage to other operating equipment, resulting in service disruptions to customers and possibly creating hazardous conditions. Further, as extreme weather conditions increase system stress, we may incur costs relating to additional system backup or service interruptions and, in some instances, we may be unable to recover such costs.”
Annual report 2025A · The company itself
Chains out: this weakens Agriculture and food production
Labour and wages
Raw materials and inputs
DriverNegative impact: weakens
“The supply chain of goods and services we rely on could be impacted by sanctions, tariffs, manufacturing labor shortages and domestic and international shipping constraints, which could increase our costs and delay delivery of critical materials.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“We may be exposed to the risk of substantial price increases in, or the adequacy or availability of, the costs of labor and materials used in construction, nonperformance of equipment and increased costs due to inflation, interest rates or other macroeconomic forces, delays, including delays relating to the procurement of permits or approvals, adverse weather or environmental matters. We engage numerous contractors and enter into a large number of construction agreements to acquire the necessary materials and/or obtain the required construction-related services. As a result, we are also exposed to the risk that these contractors and other counterparties could breach their obligations to us. Such risk could include our contractors’ inabilities to procure sufficient skilled labor as well as potential work stoppages by that labor force.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Additionally, a significant number of our physical workforce are represented by unions. We cannot provide assurances that the company will be completely free of labor disruptions such as work stoppages, work slowdowns, union organizing campaigns, strikes, lockouts or that any labor disruption will be favorably resolved. Mitigating these risks could require additional financial commitments and the failure to prevent labor disruptions and retain and/or attract trained and qualified labor could have an adverse effect on our business.”
Annual report 2025A · The company itself
InputNegative impact: weakens
“Inflation increases costs for labor, materials and services, and we may be unable to secure these resources on economically acceptable terms or offset such costs with increased revenues, operating efficiencies, or cost savings, which may adversely impact our financial condition, results of operations, liquidity, and cash flows.”
Annual report 2025A · The company itself
InputNegative impact: weakens
“However, we expect to continue to face increased cost pressures related to operation and maintenance expenses, including in the areas of health care and pension costs. We have experienced health care cost inflation in recent years, and we expect our cash outlay for health care costs, including prescription drug coverage, to continue to increase despite measures that we have taken requiring employees and retirees to bear a higher portion of the costs of their health care benefits. The measurement of our expected future health care and pension obligations and costs is highly dependent on a variety of assumptions, many of which relate to factors beyond our control.”
Annual report 2025A · The company itself
InputNegative impact: weakens
“Key components of the base rate case filing included a proposal to change pension and OPEB recovery to the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and OPEB expense requested in the proceeding and the actual amount each year using this method.”
Annual report 2025A · The company itself
Global trade volumes
Macro
DriverNegative impact: weakens
“Supply chain disruptions could have an adverse effect on our results of operations, cash flow and financial condition. We have in the past and may in the future experience supply chain challenges due to economic conditions that developed during the COVID-19 pandemic and have continued in the years since, with order lead times increasing across numerous material categories. The situation is fluid and a prolonged continuation or further increase in supply chain disruptions could have an adverse effect on FirstEnergy’s results of operations, cash flow and financial condition.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“The supply chain of goods and services we rely on could be impacted by sanctions, tariffs, manufacturing labor shortages and domestic and international shipping constraints, which could increase our costs and delay delivery of critical materials.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“We may be exposed to the risk of substantial price increases in, or the adequacy or availability of, the costs of labor and materials used in construction, nonperformance of equipment and increased costs due to inflation, interest rates or other macroeconomic forces, delays, including delays relating to the procurement of permits or approvals, adverse weather or environmental matters. We engage numerous contractors and enter into a large number of construction agreements to acquire the necessary materials and/or obtain the required construction-related services. As a result, we are also exposed to the risk that these contractors and other counterparties could breach their obligations to us. Such risk could include our contractors’ inabilities to procure sufficient skilled labor as well as potential work stoppages by that labor force.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Energy markets depend heavily on active participation by multiple counterparties, which could be adversely affected should there be disruptions in the bank and capital markets. Reduced capital and liquidity and failures of significant institutions that participate in the energy markets could diminish the liquidity and competitiveness of energy markets that are important to our business.”
Annual report 2025A · The company itself
DriverPositive impact: strengthens
“Transmission facilities of JCP&L, MP, PE and the Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM under the PJM Tariff.”
Annual report 2025A · The company itself
Chains in: Tariffs and trade policy weakens, Geopolitical uncertainty weakens, Business cycle and GDP growth strengthens
Chains out: this strengthens Shipping and logistics
Cyber attacks and IT security risk
Macro
DriverNegative impact: weakens
“Increasingly sophisticated cyber-attacks, ransomware, and other security breaches—whether targeting us or third parties with whom we do business—could disrupt operations, compromise confidential information, and result in significant financial, legal, and reputational harm. Cybersecurity threats, including those that exploit advances in technologies such as artificial intelligence, continue to grow in frequency and sophistication, and the security controls we implement may not fully prevent or detect all such threats or incidents. Emerging artificial intelligence technologies may be used to develop new hacking tools, obscure malicious activities, exploit vulnerabilities, and increase the difficulty of detecting threats. Despite ongoing investments in cybersecurity, we cannot guarantee prevention or timely detection of all threats, which continue to evolve and may be amplified by interconnected systems.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“A successful attack or breach could lead to service interruptions, regulatory penalties, litigation, remediation costs, and loss of customer trust. Any such cyber incident could result in significant lost revenue, the inability to conduct critical business functions and serve customers for a significant period of time, the loss of confidential, sensitive and proprietary information, including but not limited to personal information of our customers, employees, suppliers, vendors and other third parties, the use of significant management resources, legal claims or proceedings, regulatory penalties, significant remediation costs, increased regulation, increased capital costs, increased insurance costs, increased protection costs for enhanced cybersecurity systems or personnel, and/or damage to our reputation, all of which could materially adversely affect our business, results of operations, financial condition and reputation.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Also, FirstEnergy, or its vendors and service providers, may be at an increased risk of a cyber-attack and/or data security breach due to the nature of its business. Any such cyber incident could result in significant lost revenue, the inability to conduct critical business functions and serve customers for a significant period of time, the use of significant management resources, legal claims or proceedings, regulatory penalties, significant remediation costs, increased regulation, increased capital costs, increased protection costs for enhanced cyber security systems or personnel, damage to FirstEnergy's reputation and/or the rendering of its internal controls ineffective, all of which could materially adversely affect FirstEnergy's business, results of operations, financial condition and reputation.”
Annual report 2025A · The company itself
Chains out: this strengthens Cybersecurity (products and services)
EU climate and energy policy
Regulation
DriverNegative impact: weakens
“To the extent that changes in 18 government policies limit or restrict the usage of coal as a source of fuel in generating electricity or alternate fuels, such as natural gas, or displace coal on a competitive basis, FE's business and results of operations could be adversely affected. These legal requirements and any future initiatives could impose substantial additional costs and, in the case of GHG requirements, could raise uncertainty about the future viability of fossil fuels, particularly coal, as an energy source for new and existing electric generation facilities and could require MP’s coal-fired generation to curtail generation or cease to generate.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“In general, environmental requirements applicable to the electric power sector are becoming increasingly prescriptive and stringent, and the EPA finalized a number of rules in 2024 that could impact the Registrants.”
Annual report 2025A · The company itself
Chains out: this strengthens Circular economy and recycling, strengthens Energy efficiency
Aluminium
Raw materials and inputs
InputNegative impact: weakens
“Prices for equipment, materials, supplies, employee labor contractor services, together with the cost of variable-rate debt, have increased in recent years and could continue to increase in 2026 and beyond. Inflation and broader economic conditions have continued to drive up the price of the cost of essential components used in the construction of transmission infrastructure, such as electrical equipment, steel and aluminum, and we may experience supply chain disruptions and long lead times for critical equipment.”
Annual report 2025A · The company itself
Labour regulation
Regulation
DriverNegative impact: weakens
“On May 15, 2025, the Ohio Governor signed HB 15, which repealed the statute authorizing ESPs in Ohio, effective August 14, 2025. On December 17, 2025, the PUCO dismissed the Ohio Companies’ application for ESP VI due to the repeal of the ESP statute.”
Annual report 2025A · The company itself
Steel
Raw materials and inputs
InputNegative impact: weakens
“Prices for equipment, materials, supplies, employee labor contractor services, together with the cost of variable-rate debt, have increased in recent years and could continue to increase in 2026 and beyond. Inflation and broader economic conditions have continued to drive up the price of the cost of essential components used in the construction of transmission infrastructure, such as electrical equipment, steel and aluminum, and we may experience supply chain disruptions and long lead times for critical equipment.”
Annual report 2025A · The company itself
Chains in: Wind power strengthens
Tariffs and trade policy
Macro
DriverNegative impact: weakens
“The presidential administration took action in 2025 to impose substantial new or increased tariffs. Any widespread imposition of new or increased tariffs could have an adverse effect on our results of operations, cash flow and financial condition. New or increased tariffs could also negatively affect U.S. national or regional economies, which also could negatively impact our business and results of operations.”
Annual report 2025A · The company itself
Chains in: Geopolitical uncertainty strengthens
Chains out: this weakens Global trade volumes
Business cycle and GDP growth
Macro
DriverNegative impact: weakens
“The success of our growth strategy will depend, in part, on the successful growth of revenue resulting from our transmission investments in line with our expectations. Factors that may affect our revenue growth may include: (1) FERC’s timely approval of rates to recover such investments; (2) whether investments are included in PJM's RTEP; (3) FERC's evolving policies with respect to incentive rates for transmission investment assets, the calculation of the base ROE component of transmission rates, and the interconnection of AI data centers and transmission network upgrades supporting such large loads; (4) FERC’s potentially-evolving policies regarding whether certain classes of network transmission upgrade costs can be capitalized as part of transmission rates and whether such costs will be direct charged to the connecting customer; (5) consideration and potential impact of the objections of those who oppose such investments and their recovery; and (6) timely development, construction, and operation of the new facilities.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Competitive market forces or adverse regulatory actions may require FirstEnergy to purchase capacity and energy from the market or build additional resources to meet customers’ energy needs in an expedited manner. If that occurs, we may see opposition to recovery of these additional costs and could experience a lag between when costs are incurred and when regulators permit recovery in rates. These situations could have negative impacts on results of operations and cash flows.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Macroeconomic conditions that are beyond our control, such as government fiscal policy, tariffs, recessions, inflation and interest rate pressures, may negatively impact our financial condition, results of operations, liquidity, and cash flows. Economic conditions, including those that may arise from government fiscal policy, tariffs, recessions, inflationary and interest rate pressures, may impact the demand for electricity and, therefore, any decline in economic conditions could lead to declines in the demand for electricity, which would reduce our revenues.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Additionally, the operations of the Electric Companies are affected by the economic conditions in their respective service territories and those conditions could negatively impact the rate of delinquent customer accounts and our collections of accounts receivable, which could adversely impact our financial condition, results of operations and cash flows.”
Annual report 2025A · The company itself
Chains out: this strengthens Global trade volumes, strengthens Construction
Carbon tax and ETS prices
Regulation
DriverNegative impact: weakens
“As further discussed in Note 14., “Commitments, Guarantees, and Contingencies - Regulation of Waste Disposal,” of the Combined Notes to Financial Statements of the Registrants on May 8, 2024, the EPA finalized changes to the CCR rule addressing certain legacy CCR disposal sites that were not included in previous CCR rules. As a result, during 2024, FirstEnergy performed a preliminary assessment of former CCR disposal sites and calculated an initial estimate applying historical experience in remediating comparable sites.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“AE Supply transferred the McElroy’s Run CCR impoundment facility and adjacent dry landfill and related remediation obligations on March 4, 2025, pursuant to the environmental liability transfer agreement dated February 3, 2025, with a subsidiary of IDA Power, LLC. Pursuant to the agreement, AE Supply established a $160 million escrow account that AE Supply will fund over five years and is secured by a surety bond, which is guaranteed by FE.”
Annual report 2025A · The company itself
Chains out: this weakens Shipping and logistics, strengthens Energy efficiency, weakens Cement and building materials
Geopolitical uncertainty
Macro
DriverNegative impact: weakens
“Physical acts of war, terrorism, sabotage or other attacks on any of our facilities or other infrastructure could have an adverse effect on our business, results of operations, cash flows and financial condition. As a result of the continued threat of physical acts of war, terrorism, sabotage or other attacks in the United States, our electric generation, fuel storage, transmission and distribution facilities and other infrastructure, including electric generation facilities, transformer and high voltage lines and substations, or the facilities or other infrastructure of an interconnected company, could be direct targets of, or indirect casualties of, an act of war, terrorism, sabotage or other attack, which could result in disruption of our ability to generate, purchase, transmit or distribute electricity for a significant period of time, otherwise disrupt our customer operations and/or result in incidents that could result in harmful effects on the environment and human health, including loss of life.”
Annual report 2025A · The company itself
DriverNegative impact: weakens
“Our results of operations could be adversely affected by events beyond our control, such as natural disasters, public health crises, government shutdowns, trade wars, recessions, political crises, negative global climate patterns, mine subsidence, or other catastrophic events. Our operations, or those of our vendors or suppliers, could be negatively impacted by various events beyond our control, including, but not limited to: natural disasters, such as hurricanes, tornadoes, floods, earthquakes, wildfires, extreme cold weather events and other adverse weather conditions; public health crises, such as pandemics and epidemics; prolonged government or regulator furloughs or shutdowns; trade wars; recessions; political crises, such as terrorist attacks, war, labor unrest, and other political instability; negative global climate patterns, especially in water stressed regions; surface subsidence from underground mining impacting our facilities; or other catastrophic events, such as fires or other disasters occurring at our distribution facilities or our service providers’ facilities, whether occurring in the United States or internationally.”
Annual report 2025A · The company itself
Chains out: this strengthens Defence budgets, strengthens Energy security, strengthens Tariffs and trade policy, weakens Global trade volumes, strengthens Sea freight and freight rates, weakens Reconstruction of Ukraine
Pandemics and outbreaks
Macro
DriverNegative impact: weakens
“Our results of operations could be adversely affected by events beyond our control, such as natural disasters, public health crises, government shutdowns, trade wars, recessions, political crises, negative global climate patterns, mine subsidence, or other catastrophic events. Our operations, or those of our vendors or suppliers, could be negatively impacted by various events beyond our control, including, but not limited to: natural disasters, such as hurricanes, tornadoes, floods, earthquakes, wildfires, extreme cold weather events and other adverse weather conditions; public health crises, such as pandemics and epidemics; prolonged government or regulator furloughs or shutdowns; trade wars; recessions; political crises, such as terrorist attacks, war, labor unrest, and other political instability; negative global climate patterns, especially in water stressed regions; surface subsidence from underground mining impacting our facilities; or other catastrophic events, such as fires or other disasters occurring at our distribution facilities or our service providers’ facilities, whether occurring in the United States or internationally.”
Annual report 2025A · The company itself
Chains out: this weakens Aviation and travel, strengthens Vaccines (travel health and preparedness)
Renewables auctions and subsidies
Regulation
DriverNegative impact: weakens
“On July 4, 2025, President Trump signed into law the OBBBA, which, among other things, makes permanent certain corporate tax incentives that were set to expire in the TCJA, and terminates tax credits for most wind and solar projects placed in service 119 after 2027. Because many of the provisions of the TCJA will be continued under the OBBBA, and as FirstEnergy is not materially impacted by tax incentives associated with wind and solar projects, FirstEnergy does not expect to be materially impacted by the OBBBA.”
Annual report 2025A · The company itself
Chains in: Wind power strengthens
Semiconductors and electronic components
Raw materials and inputs
DriverPositive impact: strengthens
“Supply Plan Supply Chain While supply lead times have not fully returned to levels prior to the COVID-19 pandemic, FirstEnergy continues to monitor the situation in light of demand increases across the industry, including due to data center usage, and the imposition of tariffs and retaliatory tariffs that have been, and may be, imposed by the U.S. government in response.”
Annual report 2025A · The company itself
Chains in: Artificial intelligence strengthens
Chemicals and specialty chemicals
Raw materials and inputs
InputNegative impact: weakens
“In order to meet emission requirements, MP holds contracts for a variety of reagents expiring at various times through 2031, as well as the ability to purchase additional reagents through the spot market. Additionally, MP is granted emission allowances by the EPA and purchases additional allowances as needed to meet emission requirements.”
Annual report 2025A · The company itself
Denmark
Geography
Geography
“FirstEnergy's Distribution segment, which consists of the Ohio Companies and FE PA, distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its default service or standard service offer requirements.”
Annual report 2025A · The company itself
IT operations and cloud
Raw materials and inputs
InputNegative impact: weakens
“FESC provides corporate support and other services, including executive administration, accounting and finance, risk management, human resources, corporate affairs, communications, information technology, legal services and other similar services at cost, in accordance with its cost allocation manual, to affiliated FirstEnergy companies under FESC agreements. Allocated costs are for services that are provided on behalf of more than one company, or costs that cannot be precisely identified and are allocated using formulas developed by FESC.”
Annual report 2025A · The company itself
Competitors mentioned in the report
No named competitors in the report.
Financial figures
| Revenue latest fiscal year | 15.09 bn USD |
| Revenue growth vs. the year before, same method | 12 % |
| EBITDA reported by the company | 3.87 bn USD |
| Net debt debt incl. leasing minus cash | 25.74 bn USD |
| Diluted EPS per share | 1.76 USD |
Source: 10-K (SEC) A. See the report
Criteria
| Profit | ✓ |
| Growing | ✓ |
| Healthy balance sheet | ✗ |
Only the criteria that can be computed from financial statements on this page. The remaining criteria (such as price and dividend) need a share price and are in the analysis.
Figures are in the report's currency (USD), not converted to DKK. Quotes are shown as the company's own words in English.